Chandra Asri

Boil of Gas Ethylene Recovery System

 

Data and Overview

Overview

PT. Chandra Asri intends to build the facility for the Boil-off Gas (BOG) Ethylene Recovery System inside its existing petrochemical plant at Anyer, West Java - Indonesia. The BOG Ethylene Recovery System is used to process the vapor generated from High Pressure tanks and Low Pressure Ethylene tank. The vapor compressed by the compressor and then being liquefied in the propylene condenser andthe liquid is flowed back to the Low Pressure tank.
 

Main Equipment Installation

  • BOG compressor.
  • BOG condenser.
  • Propylene refrigeration compresor.
  • Propylene condenser.
  • Connecting the BOG Control system to the existing control system.

Photos

      

Click here to view the photo gallery go